Hera and General Electric together for energy recovery
Focus
Focus
Category Facet
Custom Facet
Search Results
-
Document on-date Jul 17, 2018 9:55 AM
DICHIARAZIONE AMBIENTALE ANNO 2018 COMPLESSO IMPIANTISTICO DI VIA CARUSO 150 MODENA (MO) Rev. 0 del 16/05/2018 1 PREMESSA Il presente documento...
-
Document on-date Jul 17, 2018 9:56 AM
001492001492 DICHIARAZIONE AMBIENTALE ANNO 2018 COMPLESSO IMPIANTISTICO Via Cavazza 45 Modena (MO) Rev. 0 del 23/04/2018 1 PREMESSA Il presente...
-
Document on-date Jul 17, 2018 9:56 AM
DICHIARAZIONE AMBIENTALE ANNO 2018 COMPLESSO IMPIANTISTICO Via San Martino in Venti 19 Località Cà Baldacci Rimini (RN) Rev.0 del 22/05/2018 1 PREMESSA Il...
-
Document on-date Jul 26, 2018 12:20 PM
Free Float 51.6% Public shareholders 48.4% mln € H1 14 H1 15 H1 16 H1 17 H1 18 Total revenues 2,228.3 2,368.9 2,314.7 2,956.3 3,176.5 Ebitda 450.9 459.1 470.1 505.9 523.6 Ebit 242.8 245.0...
-
Document on-date Jul 26, 2018 12:20 PM
P&L Profit and Loss account € /000 30-Jun-2018 30-Jun-2017 Sales 2,966.7 2,754.0 Other operating revenues 209.8 202.3 Raw materials (1,327.6) (1,178.4) Services (1,031.6) (981.7) ...
-
Document on-date Nov 6, 2018 3:04 PM
P&L Profit and Loss account € /000 30-Sep-2018 30-Sep-2017 Sales 4,348.4 4,027.8 Other operating revenues 321.1 327.3 Raw materials (1,966.6) (1,776.4) Services (1,529.2) (1,428.6) ...
-
Document on-date May 14, 2019 10:33 AM
Consolidate quarterly report as at 31 March 2019 Table of contents Introduction Governance and control bodies 01 Mission 02 CHAPTER 1 Directors’...
-
Document on-date Jun 17, 2019 2:30 PM
DICHIARAZIONE AMBIENTALE ANNO 2019 COMPLESSO IMPIANTISTICO di Viale della Navigazione Interna, 34 35129 - Padova (PD) Rev. 0 del 28/02/2019 1 PREMESSA ...
-
Document on-date Jun 17, 2019 2:30 PM
D IC H IA R A Z IO N E A M B IE N T A L E 2 0 1 9 COMPLESSO IMPIANTISTICO Via Tomba 25 Lugo (RA) Rev. 0 del 26/03/2019 DATI AGGIORNATI AL 31/12/2018 ...
-
Document on-date Jul 25, 2019 12:09 PM
Analyst presentation H1 2019 FINANCIAL RESULTS Non-stop growth“ “ 262 274 289 '17 '18 '19 Ebitda (M€) +4.3% 1H ’18/‘19 Ebit (M€) Net Profit (M€) Debt/Ebitda (x) Rolling +5.6% 1H...
-
Document on-date Aug 1, 2019 10:53 AM
D IC H IA R A Z IO N E A M B IE N T A L E 2 0 1 9 COMPLESSO IMPIANTISTICO di Via Bocche 20, Baricella (BO) Rev. 0 del 18/04/2019 DATI AGGIORNATI AL 31/12/2018 ...
-
Document on-date Aug 1, 2019 11:02 AM
D IC H IA R A Z IO N E A M B IE N T A L E 2 0 1 9 COMPLESSO IMPIANTISTICO DI VIA CARUSO 150 Modena (MO) Rev. 0 del 30/05/2019 DATI AGGIORNATI AL 31/12/2018 ...
-
Document on-date Nov 11, 2019 4:24 PM
Free Float 53.4% Public shareholders 46.6% FACT SHEET 9M 2019 www.gruppohera.it CONTACTS INVESTOR RELATIONS HERA SpA Viale Berti Pichat, 2/4 - 40127...
-
Document on-date Nov 11, 2019 4:24 PM
P&L Profit and Loss account € /000 30-Sep-2019 30-Sep-2018 Sales 5,063.2 4,348.4 Other operating revenues 366.7 321.1 Raw materials (2,504.9) (1,966.6) Services (1,698.4) (1,529.2) ...
-
Document on-date Nov 13, 2019 11:04 AM
D IC H IA R A Z IO N E A M B IE N T A L E 2 0 1 9 COMPLESSO IMPIANTISTICO Via Traversagno 30 Località Voltana, Lugo (RA) Rev. 0 del 29/05/2019 DATI AGGIORNATI AL...
-
Document on-date Feb 27, 2020 10:23 AM
CODE OF ETHICS IV EDITION 2 3 The Code of Ethics of the Hera Group represents...
-
Document on-date Sep 9, 2020 2:11 PM
-
Document on-date Sep 9, 2020 2:14 PM
-
Document on-date Sep 11, 2020 9:07 AM
-
Document on-date Sep 11, 2020 10:28 AM
Asset Publisher
We have installed a turbo expander at the R&M stations of Ducati's factory in Bologna. The goal is to recover electricity from the decompression process of methane gas.
An experimental and innovative project with an ambitious goal: energy recovery and lower consumption of fossil fuels by decompressing the methane gas distributed in urban networks.
The exclusive agreement between Hera Group and General Electric specifically involves installing a turbo expander at the R&M stations (gas delivery points) of the Ducati factory in Bologna. It is a medium-small turbo expander (330 kW electric), which can be installed in medium-sized R&M stations, that in combination with a heat pump that uses CO2 as a thermal carrier fluid, recovers part of the electric energy to preheat the gas used in the process.
In 2019, we completed all the production start-up activities and started the provisional running phase, in order to carry out all the performance and endurance tests. It is scheduled to start operating at full capacity in the second half of 2020.
Once the testing is completed, if the expected performance is confirmed, this technology can be installed in other methane gas decompression stations of the Hera Group.
The project, moreover, contributes to achieving target 7.3 of the UN’s 2030 Agenda.
Search Bar
Tag Facet
Search Results
Asset Publisher