Bus fuel from trash: Hera's pilot project with "START"
Focus
Focus
Category Facet
Custom Facet
Search Results
-
Document on-date Feb 17, 2021 2:40 PM
-
Document on-date Feb 17, 2021 12:49 PM
-
Document on-date Feb 10, 2021 4:31 PM
-
Document on-date Feb 11, 2021 2:38 PM
-
Document on-date Feb 11, 2021 5:14 PM
-
Document on-date Feb 1, 2021 9:50 AM
001492001492 DICHIARAZIONE AMBIENTALE ANNO 2018 COMPLESSO IMPIANTISTICO Via Cavazza 45 Modena (MO) Rev. 0 del 23/04/2018 1 PREMESSA Il presente...
-
Document on-date Feb 1, 2021 9:50 AM
DICHIARAZIONE AMBIENTALE ANNO 2018 COMPLESSO IMPIANTISTICO Via Traversagno 30 Località Voltana, Lugo (RA) Rev. 0 del 05/06/2018 1 PREMESSA Il...
-
Document on-date Feb 1, 2021 9:50 AM
DICHIARAZIONE AMBIENTALE SEZIONE 2 ANNO 2009 COMPLESSO IMPIANTISTICO Via Raibano 32, Coriano (RN) Rev. 0 del 02 luglio 2009 2 PREMESSA Il presente...
-
Document on-date Feb 1, 2021 9:50 AM
0 DICHIARAZIONE AMBIENTALE ANNO 2014 COMPLESSO IMPIANTISTICO Via Raibano 32, Coriano (RN) Rev. 0 del 17 marzo 2014 1 PREMESSA La...
-
Document on-date Feb 1, 2021 9:50 AM
DICHIARAZIONE AMBIENTALE SEZIONE 2 ANNO 2009 COMPLESSO IMPIANTISTICO I.T.F.I. Bologna, Via Shakespeare 29 Rev. 0 del 02 luglio 2009 2 PREMESSA ...
-
Document on-date Feb 1, 2021 9:50 AM
001111001111 DICHIARAZIONE AMBIENTALE ANNO 2016 COMPLESSO IMPIANTISTICO I.T.F.I. Via Shakespeare 29, Bologna (BO) Rev. 0 del 17/03/2016 ...
-
Document on-date Feb 1, 2021 9:50 AM
001117001117 DICHIARAZIONE AMBIENTALE 2016 COMPLESSO IMPIANTISTICO Via Rio della Busca Località Tessello, San Carlo (FC) Rev. 0 del 17 maggio 2016 1 ...
-
Document on-date Feb 1, 2021 10:59 AM
2 PREMESSA La Dichiarazione Ambientale costituisce il documento attraverso il quale Hera S.p.A. - Divisione Ambiente informa il lettore sugli sviluppi delle performance che il sistema di...
-
Document on-date Feb 1, 2021 10:59 AM
Rev. 00 del 06/07/2015 Pag. 0 di 90 DICHIARAZIONE AMBIENTALE ANNO 2015 IMPIANTO PER IL TRATTAMENTO E IL RECUPERO DEI RIFIUTI SOLIDI CORIANO (RN) Via Raibano 32 ...
-
Document on-date Feb 1, 2021 10:59 AM
DICHIARAZIONE AMBIENTALE ANNO 2010 COMPLESSO IMPIANTISTICO Forlì, Via Grigioni 19 Rev. 0 del 26 ottobre 2010 001398001398 PREMESSA La...
-
Document on-date Feb 1, 2021 10:59 AM
Dichiarazione Ambientale Sito di Pozzilli (IS) Regolamento (CE) n. 1221/2009 Rev. 11 – 1 Luglio 2013 Dati aggiornati al 31.03.2013. Gestione Ambientale Verificata...
-
Document on-date Feb 1, 2021 10:59 AM
0 DICHIARAZIONE AMBIENTALE ANNO 2015 COMPLESSO IMPIANTISTICO Via dell’Energia, Pozzilli (IS) Rev. 1 del 9 giugno 2015 001201001201 1 PREMESSA Il presente...
-
Document on-date Feb 1, 2021 10:59 AM
0 DICHIARAZIONE AMBIENTALE ANNO 2016 COMPLESSO IMPIANTISTICO di S.S. Romea, Km 2,6, n. 272 Ravenna (RA) Rev.0 del 11/05/2016 1 PREMESSA Il...
-
Document on-date Feb 1, 2021 10:59 AM
DICHIARAZIONE AMBIENTALE ANNO 2011 COMPLESSO IMPIANTISTICO S.S. Adriatica 16 Località Bassona Rev. 0 del 16 marzo 2011 001114001114 PREMESSA La...
-
Document on-date Feb 1, 2021 10:59 AM
DICHIARAZIONE AMBIENTALE ANNO 2012 COMPLESSO IMPIANTISTICO di Via Bocche 20 Baricella (BO) Rev. 0 del 18/05/2012 000085000085 1 PREMESSA Il presente documento...
Asset Publisher
To obtain clean energy to power Ravenna's buses by decomposing waste in landfills.
To obtain clean energy to power Ravenna's buses by decomposing waste in landfills. We are not talking about the future, but about what has already come true, thanks to an innovative waste treatment plant in Ravenna. It adds another important element in the effort to reduce environmental impact and optimise waste management.
The project is funded by the Emilia-Romagna Regional Administration and the European Commission, and is designed to highlight the advantages of using green natural gas. Which ones? It can contribute to replacing fossil energy sources with renewable energy sources; it can be used in the transport sector by contributing to achieving the 10% share of biofuels; it can provide logistics savings thanks to the extensive Italian natural gas network; and can be integrated with other renewable energy sources.
The biomethane is collected from networks inside the landfill, and from there it is channelled into a container where it is "purified" by removing the carbon dioxide and other gases in it. From there, it reaches a tank and is used for refuelling.
For now, the biomethane produced by the plant will power the buses of "Start Romagna" (Romagna's public transport company), and the pilot project will last about two years. But this is just the beginning.
For the Hera Group, this is the second biomethane production facility, after the one in Sant'Agata Bolognese, which produces green energy by treating mowing, pruning and organic waste from separate waste collection.
Search Bar
Tag Facet
Search Results
Asset Publisher